<img height="1" width="1" src="https://www.facebook.com/tr?id=610419235832899&ev=PageView &noscript=1"/>
BREXIT UPDATE: We have temporarily suspended deliveries to Europe.

Civil

Showing all 2 results

  • Paperback | Pub: 07 Apr 2003
    £14.99

    In the thirty years after the end of the Second World War, the construction schemes of the North of Scotland Hydro-Electic Board changed the face of the Highlands and brought electricity to almost the whole of the country north of the Highland Line....

  • Paperback | Pub: 03 Jun 2021
    £14.99

    ‘It may perhaps interest you if I mention a few figures in connexion with the construction of the bridge. Its extreme length, including the approach viaduct, is 2,765 yards, one and one-fifth of a mile, and the actual length of the cantilever...